Team:Heidelberg LSL/Notebook-23/02/2012

From 2012hs.igem.org

(Difference between revisions)
(Created page with "{{Top}} {{Stylesheet}} <!-- ============================================================================================ *** PLEASE NOTE: *** The contents and design of this w...")
 
(4 intermediate revisions not shown)
Line 15: Line 15:
/-->
/-->
-
<html>
+
{{NotebookUpper}}
-
<style type="text/css">
+
-
#news {min-height: 500px;}
+
-
 
+
-
.gallery p  {padding: 0 20px;
+
-
                        text-align: justify;
+
-
                        font-size: 12px;}
+
-
</style>
+
-
 
+
-
<body id="home" onload="setPageSize()">
+
-
<div id="super_main_wrapper">
+
-
<div id="SubWrapper">
+
<h2> Biosensor Construction - 23/02/2012 </h2>
<h2> Biosensor Construction - 23/02/2012 </h2>
<!--Bitte ab hier den Inhalt hineinschreiben-->
<!--Bitte ab hier den Inhalt hineinschreiben-->
 +
*<b>Transformation of GFP (BBa_ E0240) and RecA (BBa_J22106) from registry 2010 spring distribution into E. coli Top10 cells</b><br /><br />
 +
<b>Protocol:</b><br />
 +
10 ul water is added to the corresponding well, DNA is solved by incubation for 15 min at room temperature. 5 ul of DNA solution are added to 50 ul of chemocompetent Top10 cells and incubated on ice for 20 min. Afterwards, a heat shock is performed by incubation the bacteria on 42°C/50 s. After another 2 min on ice, the bacteria are plated onto LB-Amp agar plates.
<!--Bitte den Inhalt nur bis hier und nicht unterhalb dieser Zeile hineinschreiben-->
<!--Bitte den Inhalt nur bis hier und nicht unterhalb dieser Zeile hineinschreiben-->
-
</div><!--end SubWrapper-->
+
{{NotebookLower}}
-
<div id="news">
+
-
</html>
+
-
{{Sidemenue}}
+
-
<html>
+
-
</div><!--end news-->
+
-
</div><!-- end super_main_wrapper-->
+
-
</body>
+
-
 
+
-
 
+
-
<script type="text/javascript">
+
-
function setPageSize() {
+
-
len = document.getElementById('super_main_wrapper').offsetHeight;
+
-
document.getElementById('bodyContent').style.height = len + 'px';
+
-
document.getElementById('SupWrapper').style.height = len + 'px';
+
-
document.getElementById('news').style.height = len + 'px';
+
-
}
+
-
</script>
+
-
</html>
+

Latest revision as of 19:06, 6 June 2012

iGEM-2012HS - LSL-Heidelberg iGEM-2012HS - LSL-Heidelberg



Notebook

Welcome to our notebook!

Here you will find the documentation of our laboratory work of the last few month in diary form. This notebook comprises the work in three phases:

            
Planning and
Development
            
            
Biosensor
Construction
              
            
Calibration and
Characterization
              

 

 

 

 

 

 

 

 

 

 

 

 

 

Biosensor Construction - 23/02/2012

  • Transformation of GFP (BBa_ E0240) and RecA (BBa_J22106) from registry 2010 spring distribution into E. coli Top10 cells

Protocol:
10 ul water is added to the corresponding well, DNA is solved by incubation for 15 min at room temperature. 5 ul of DNA solution are added to 50 ul of chemocompetent Top10 cells and incubated on ice for 20 min. Afterwards, a heat shock is performed by incubation the bacteria on 42°C/50 s. After another 2 min on ice, the bacteria are plated onto LB-Amp agar plates.